Tag Archives: Modern

Time and Attendance Shelter.

Sheltec a eu le plaisir de fournir des abris Horodateur-distributrices de billet pour la ville de Sainte-Thérèse. Notre Abris est un ajout merveilleux au design quotidien d’un lot de parking. C’est une façon parfaite de se sentir protégé et sécurisé contre les conditions météorologiques ou tout simplement pour se sentir en sécurité lors du…

Signature bus shelters

Sheltec manufactured these modern red bus shelters for the city of Lorraine. This is our “signature” model, which can be found on our website. We’re extremely proud of the modern finish and the way the color gives a beautiful finish to the environment.

Vaudreuil-Dorion Pilot Project

Manufactured by Sheltec, this contemporary-style canopy provides users with protection from the elements or the sun during heatwaves at the Vaudreuil-Dorion train station.

Chateauguay park-and-ride (terminus) project

In collaboration with beault design and Sorel construction. Sheltec, manufactured 25 benches for the newly renovated outdoor terminus in Châteauguay. Sheltec also installed interior benches with seating on all 4 sides. And new garbage cans for recycling and garbage.  

Saint-Léonard-Montréal-Nord Station Footbridge

Sheltec is proud to have built the magnificent footbridge over the railroad tracks at Gare Saint Léonard. It will be part of the route of the future Mascouche commuter train line. You can take advantage of this new project today at Saint-Léonard station.  

Delson Shelter

Delson Shelter Every year, Sheltec manufactures several bus shelters in different cities. The latter having manufactured a bus shelter for the city of Delson innovative that bring a modern touch to the city. You can find a dozen of these wonderful SDC-designed bus shelters all over the city.